Storage Method - ABB SACE Emax 2 Installation, Operation And Maintenance Instructions For The Installer And The User

Low voltage air circuit-breakers
Table of Contents

Advertisement

Storage method Place the packaging (circuit-breakers and / or fixed parts) on a horizontal plane, not in contact with the floor.
9 | © 2017 ABB | 1SDH000999R0002 - ECN000058721 - Rev. B
If the circuit-breaker has been removed and reinserted in the package ensure, prior to storage that:
• the circuit-breaker is in the open position and springs discharged. See the chapter "Description - circuit-
breaker opening/closing operations" on page 15
• the circuit-breaker is protected and locked in its original packaging
Figure 4
Emax E1.2 circuit-breakers | 2 - Transport and checking on receipt
ABB | SACE Emax 2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Emax e1.2-aEmax e1.2

Table of Contents