Fujitsu PRIMERGY CX400 M4 Operating Manual page 47

Server enclosure
Hide thumbs Also See for PRIMERGY CX400 M4:
Table of Contents

Advertisement

V
CAUTION!
At least two people are needed to lift the server out of the rack cabinet.
For Japan, according to the following procedures.
If you remove the CX400 M4 server enclosure out of the rack, remove all
HDD, PSU and Server Node from the server enclosure.
In addition, at least two people are needed when server enclosure is
installed in the height of 25U or more.
(for Japan, please refer to " 安全上のご注意 ".)
Additionally, a lifter is required in the following cases:
– The server weighs more than 50 kg.
– The server weighs more than 21 kg and is installed above the height
of 25 U.
When using a lifter, this removal procedure needs to be carried out by
maintenance personnel.
CX400 M4
For configurations below 32 kg:
At least two people are needed to lift the server
out of the rack cabinet.
For configurations below 55 kg:
At least three people are needed to lift the server
out of the rack cabinet.
For configurations above 55 kg:
At least four people are needed to lift the server
out of the rack cabinet.
Operating Manual
Hardware installation
47

Advertisement

Table of Contents
loading

Table of Contents