Huawei BBU3900 Installation Manual page 10

Hide thumbs Also See for BBU3900:
Table of Contents

Advertisement

Installing the BBU in the APM30
b
Installing the BBU Cables
3. Install the E1/T1 surge protection transfer cable.
Fix the DB25 connector of the E1/T1 surge protection transfer cable to the INSIDE
port on the UELP and the DB26 connector to the E1/T1 port on the GTMU.
4. Install the E1/T1 cable.
4.1. Cabling the E1/T1 cable.
4.2. Fix the DB26 connector of the E1/T1 cable to the OUTSIDE port on the UELP.
4.3. Strip the jacket off the E1/T1 cable near the grounding point at the lower right
corner of the cabinet to expose the shielding layer
4.4. Thread the E1/T1 cable through the grounding clip. Then, tighten the screw on the
grounding clip to make the shielding layer of the E1/T1 cable in full contact with the
grounding clip. Finally, connect the PGND cable on the grounding clip to the ground bolt
of the APM30.
Before soldering the connectors to the E1/T1 cable, ensure that both ends of the E1 cable are
disconnected from any devices. In addition, all the connectors should be soldered to the cable.
Shielding layer of the E1/T1
cable (25 mm)
E1/T1cable
E1/T1 surge protection
transfer cable
Grounding
clip
9
Shielding layer of
the E1/T1 cable

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents