Connection Diagram; Power Supply Section (Section De L'alimentation Électrique) - Mitsubishi Electric MES3-255C-DM-EN User Manual

Energy saving data collecting server ecowebserveriii
Table of Contents

Advertisement

8. Connection Diagram

8.1
Power supply section (Section de l'alimentation électrique)
AC100 to 240V
D grounding
* An optional noise filter can be installed to the power source line in order to reduce noise more effectively.
<Recommended model>
Model:
FN343-3/01 (Rated current: 3 A)
Manufacturer:
* Demand control section requires for additional power.
It is necessary to connect AC100 to 240V (+10%,-15%) 50/60Hz to V1,V2 in demand terminal block.
It is possible to take the power from the power supply section.
Do not use UPS, SAG and etc. to supply the power.
Note
* See page 3 for detailed cautions.
* Never work with live wires.
* Use electric wires of appropriate size.
See page 3 for information on wire size.
* Perform class D grounding dedicated for
the FG and LG terminals.
* Use the power terminals L and N via a
noise filter.
Software and data of EcoWebServerIII is being saved in compact flash card.
It might cause data corruption by a power failure or an instant power. Please consider UPS if the power failure
is frequently occurred. Please confirm the content to turn off EcoWebServerIII for maintenance. Procedure
refers to [Names and functions of parts].
.
Noise
filter
SCHAFFNER
Note
* Voyez les remarques sur la page 3.
* Fil sous tension N'est PAS permis.
* Taille de câble, regardez la page 3.
* FG, LG est réservé s exclusive aux bases
de classe D.
* Connectez L, N via un filtre de bruit.
31

Advertisement

Table of Contents
loading

Table of Contents