Huawei Airbridge BTS3606A Technical Manual page 45

Cdma base station
Hide thumbs Also See for Airbridge BTS3606A:
Table of Contents

Advertisement

Technical Manual
Airbridge BTS3606A CDMA Base Station
Version query
l
Status query
l
Electronic label query
l
Log management
l
Equipment reset
l
Resource blocking/unblocking
l
Power supply management
l
VI. Test management
The test management facilitates fault location and the optimization of system
performance. The tests include board loopback test, self-detection test, and Abis link
test.
VII. Tracing management
The tracing management aims to help the fault location and performance measurement
analysis. The traced objects include various interfaces and indices.
Some indices (such as CPU load, board temperature, BTRM transmit power, and
receive signal strength indicator) can be displayed in graphics on real-time basis.
Chapter 6 Operation and Maintenance System
6-5
System Description

Advertisement

Table of Contents
loading

Table of Contents