Disassembly/Assembly; Field Replacement Procedures; Field Replacement Preparation - GE ApexPro Service Manual

Telemetry server
Hide thumbs Also See for ApexPro:
Table of Contents

Advertisement

Disassembly/assembly

Field replacement procedures

Field replacement preparation

2001989-203C
WARNING
EQUIPMENT DAMAGE/PERSONAL INJURY — Complete the
preparation before performing any other procedure in this chapter.
See Field replacement preparation on page 7-3.
Failure to follow this instruction could result in equipment damage
or personal injury.
Field replacement information for the following components are included in this
chapter:
See Field replacement preparation on page 7-3.
See Fan filter on page 7-5.
See Drive filter on page 7-6.
See Chassis cover on page 7-6.
See Network card on page 7-7.
See RAID card on page 7-8.
See SNMP boards on page 7-11.
See SNMP battery removal on page 7-14.
See Drive bay on page 7-16.
See Hard drive on page 7-18.
See CD ROM drive on page 7-22.
See CPU fan on page 7-23.
See Chassis fan on page 7-24.
See CPU boards on page 7-25.
See Power module on page 7-30.
See Temperature sensor on page 7-32.
WARNING
LOSS OF FUNCTION/EQUIPMENT DAMAGE — Only a
qualified service technician should perform the procedures in this
chapter.
Failure to follow this instruction could result in loss of ATS and/or
equipment damage.
ApexPro™ Telemetry
Parts lists, drawings and replacement
7-3

Advertisement

Table of Contents
loading

Table of Contents