Siemens Sinorix al-deco STD Operating Handbook page 26

Machine tools in the metal working industry
Table of Contents

Advertisement

Technical data
Interface connections
E
A
B
C
D
E
The terminal configuration can be seen from connection diagram on the following page.
26
Building Technologies
Fire Safety
C
D
For storage and transport, the red plug-in bridge (BR1) is fitted to just one pin. This
protect the battery from being unnecessary discharged. After commissioning, the red
plug-in bridges (BR1) must be fitted to both pins so that the battery will go into
operation.
The power supply to the communication interface is switched on and off with the slider
switch.
Switch right
=
switched on
Switch left
=
switched off
USB plug for the read-out of the system data.
Battery for bridging over losses of the mains supply for up to 12 hours. (Refer to the
Maintenance and Repair Instructions for the replacement of the battery)
Rating plate with all the information required by the regulations
B
A
C
A54475-A1-A2_EN_05.docx
01.2018

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents