Change the Operation Schedule

Set the details of the operation schedule

Schedule settings can be applied from either the group screen or the individual control screen. In the following procedure, the
individual control screen is used.
1
1
-(1)
-(1)
1
1
Tap [
-(1)] on the group screen or individual control
screen
2
2
Tap [
-(1)]
2
2
-(1)
-(1)
3
Tap
of the schedule you want to change
4
Change the target air conditioner(s) or ON/OFF unit as
4
4
-(1)
-(1)
necessary, then tap [
5
Scroll the screen and tap the value of the item you want to
set
4
-(1)]
Owner's Manual
EN
45-