Shipping Requirements - Dell EqualLogic PS4210 Hardware Owner's Manual

Storage arrays
Hide thumbs Also See for EqualLogic PS4210:
Table of Contents

Advertisement

PS4210 Hardware Owner's Manual

Shipping Requirements

If you plan to move a previously installed array geographically, for safety reasons, discharge the battery to a
lower charge level. To discharge the battery, shut down the array using the
also places the smart battery into ship mode, which minimizes further charge loss while in storage/transport.
When you reinstall the array, on first power up, there will be a delay of up to 20 minutes while the batteries
charge back up to 100 percent.
Before You Begin
1. Ensure that the control module that you are going to be replacing the battery on is in secondary mode. If it is
active, fail the control module over so that it becomes the secondary one.
To make the control module secondary:
a. Click
Group.
b. Expand
Members
c. Click the
Controllers
d. Click the
Maintenance
2. If applicable, label the network cables on the secondary control module so that you can reinstall them
correctly later.
Remove the Battery
1. Disconnect the network cables from the secondary control module.
2. Remove the secondary control module and place it on a static-safe work area with the battery cover facing
up.
3. The battery cover, which holds the battery and related electronics, is held in place by a single screw. This
screw is not captive. Loosen the screw using a Phillips #2 screwdriver
the hole, and set it aside.
and select the member name.
tab to display the status of the control module.
tab, and click
Figure 22: Removing the Screw From the Battery Cover
.
restart
3 Maintaining Control Modules
command. This command
halt -b
(Figure
22), remove the screw from
27