B Setting Dry Contact Scheduling Parameters - Huawei SUN2000-8KTL-M0 User Manual

Hide thumbs Also See for SUN2000-8KTL-M0:
Table of Contents

Advertisement

SUN2000-(12KTL, 15KTL, 17KTL, 20KTL)-M0
User Manual
Scenario 1: Single inverter + Smart Dongle
Prerequisites
You have logged in to the app as installer. The initial password is 00000a. Use the initial
password upon first power-on and change it immediately after login. To ensure account
security, change the password periodically and keep the new password in mind. Not changing
the initial password may cause password disclosure. A password left unchanged for a long
period of time may be stolen or cracked. If a password is lost, devices cannot be accessed. In
these cases, the user is liable for any loss caused to the PV plant.
Procedure
Step 1 Set dry contact scheduling parameters.
Issue 03 (2019-07-19)
B
Setting Dry Contact Scheduling
Set Dry contact scheduling to
Copyright © Huawei Technologies Co., Ltd.

B Setting Dry Contact Scheduling Parameters

, and set Active power control and Reactive power control.
Parameters
80

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents