SUN2000-(20KTL, 29.9KTL, 30KTL, 36KTL, 40KTL)-
M3
User Manual
G
Prerequisites
You have logged in to the app as installer.
Procedure
Step 1 On the home screen, choose Settings > Power adjustment and set Dry contact
scheduling to
Figure G-1 Setting dry contact scheduling parameters
----End
Issue 01 (2020-10-15)
Setting Dry Contact Scheduling
.
Copyright © Huawei Technologies Co., Ltd.
G Setting Dry Contact Scheduling Parameters
Parameters
84