Chapter 4 Procedures Before Operation - Mitsubishi Electric MELSEC iQ-R Series User Manual

Ethernet/ip network interface module
Hide thumbs Also See for MELSEC iQ-R Series:
Table of Contents

Advertisement

4
PROCEDURES BEFORE OPERATION
This chapter describes the procedures before operation.
1.
Mounting the module to the base unit
The RJ71EIP91 has no module fixing hooks. For how to mount/remove a module having no module fixing hooks to/from the
base unit, refer to the following.
 MELSEC iQ-R Module Configuration Manual
2.
Network configuration
Configure the system and set the parameters that are required for start-up.
• Wiring ( Page 27 WIRING)
• Parameter settings ( MELSEC iQ-R EtherNet/IP Network Interface Module User's Manual (Application))
3.
Network diagnostics
Check the connection status of the connected EtherNet/IP device using EtherNet/IP Configuration Tool.
For details, refer to the following.
 MELSEC iQ-R EtherNet/IP Network Interface Module User's Manual (Application)
4.
Programming
Create a program. For details, refer to the following.
Page 29 COMMUNICATION EXAMPLE
4 PROCEDURES BEFORE OPERATION
22

Advertisement

Table of Contents
loading

Table of Contents