3
PROCEDURES BEFORE OPERATION
This chapter describes the procedures before operation.
CC-Link IE Field Network Basic
1.
Checking the specifications of the FX5-ENET
Check the specifications of the FX5-ENET. ( Page 17 SPECIFICATIONS)
2.
Installation of the FX5-ENET
Connect the FX5-ENET to the CPU module. For details, refer to the following.
MELSEC iQ-F FX5S/FX5UJ/FX5U/FX5UC User's Manual (Hardware)
3.
Configuring a network
Configure a network and set parameters which are required for start-up.
• Wiring ( Page 64 WIRING)
• Parameter setting ( Page 68 PARAMETER SETTINGS)
4.
Network diagnostics
Check the status of a network by executing the CC-Link IE Field Network Basic diagnostics. ( Page 104 CC-Link IE Field
Network Basic Diagnostics)
5.
Programming
Create a program. ( Page 93 PROGRAMMING)
6.
Check the communication status
Check the communication status of FX5-ENET. ( Page 97 Checking the Module Status)
General-purpose Ethernet communication
1.
Checking the specifications of the FX5-ENET
Check the specifications of the FX5-ENET. ( Page 17 SPECIFICATIONS)
2.
Installation of the FX5-ENET
Connect the FX5-ENET to the CPU module. For details, refer to the following.
MELSEC iQ-F FX5S/FX5UJ/FX5U/FX5UC User's Manual (Hardware)
3.
Configuring a network
Configure a network and set parameters which are required for start-up.
• Wiring ( Page 64 WIRING)
• Parameter setting ( Page 68 PARAMETER SETTINGS)
In the following steps, refer to the following manual for each function.
MELSEC iQ-F FX5 User's Manual (Ethernet Communication)
MELSEC iQ-F FX5 User's Manual (BACnet)
3 PROCEDURES BEFORE OPERATION