Mounting Procedure For Side-By-Side Rack Mounting; Ied Mounted With A Rhgs6 Case - ABB Relion 670 Series Installation Manual

Version 2.2 ansi
Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

1MRK 514 026-UUS F
5.3.4.2

Mounting procedure for side-by-side rack mounting

3
4
IEC04000456 V3 EN-US
Figure 7:
PosNo
1
2, 3
4
5
5.3.4.3

IED mounted with a RHGS6 case

A 1/2 x 19" or 3/4 x 19" size IED can be mounted with a RHGS case (6 or 12 depending on IED size).
The RHGS case can be used for mounting a test switch of type RTXP 24. It also has enough space
for a terminal base of RX 2 type for mounting of, for example, a DC-switch or two auxiliary relays.
670 series
Installation manual
1
2
IEC040004563enOriginal.vsdx
Side-by-side rack mounting details.
The required torque for the screws is 3.5 Nm.
Description
Mounting plate
Screw
Mounting angle
Washer
3
Quantity
2
16
2
16
Section 5
Mounting
M11955-2 v4
Type
-
M4x6
-
M4x6
M11953-3 v4
25