Removing, Repairing And Exchanging; Product Lifecycle; Checking Ied Information; Removing The Ied - ABB Relion 670 Series Installation Manual

Version 2.2 ansi
Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

1MRK 514 026-UUS F
Section 8
8.1

Product lifecycle

At some point of the product lifecycle, the IED will be upgraded to a next generation unit. When
selecting the original product, already consider the upgrading and extension possibilities that the
specific product offers for its whole lifecycle.
8.2

Checking IED information

The IED information includes detailed information about the device, such as version and serial
number. To find the information navigate through the LHMI menus as indicated below:
1.
Select Main Menu/Diagnostics/IED status.
2.
Select a submenu with
3.
Enter the selected submenu with
4.
Browse the information with
The Product identifiers submenu contains product related information including product type,
serial number, order number, production date and SW version.
The Installed HW submenu contains information about the HW modules.
8.3

Removing the IED

Before removing the IED, make sure that auxiliary power is turned off and all wiring is
disconnected.
8.4

Sending the IED for repair

In case of product problems, contact the nearest ABB office or representative for consultation and
instructions.
670 series
Installation manual

Removing, repairing and exchanging

and
.
and
For upgrade purposes the IED does not need to be removed. Before removing the
IED check with your local ABB office if the IED can be upgraded.
.
.
Section 8
Removing, repairing and exchanging
GUID-D1A48469-E2DB-4E39-8431-1686F13FFC4D v8
GUID-2CAE273B-B384-438A-B21C-C0BC86E203A1 v3
GUID-6F99E661-D319-4782-97E9-3A864B1E972D v2
AMU0600445 v4
77

Advertisement

Table of Contents
loading

Table of Contents