NOTE
At your laboratory's discretion, you may use other positions for the washes on each
of the trays, but you must change the entries for the alternate positions in the
appropriate fields on the WASH Set window.
4. At the WASH Set window, define the WASH3 container positions as follows:
a. Select
b. Select
c. Type
d. Type
5. Select
Performing the shutdown wash
Materials required:
• 10% solution of Cuvette Wash
Solution (REF 00195330, PN B01-
4178-01)
• Deionized water
• ISE Detergent
(REF 01307361,
PN B01-4174-01)
Time: 38 minutes
Analyzer mode: READY
The daily shutdown wash uses a detergent to clean the probe lines, reaction and dilution
cuvettes, and ISE components.
NOTE
Laboratories running only urine samples or those running the system more than 8 hours
per day are advised to perform the Weekly wash procedure in place of this Shutdown
wash procedure.
For location of washes on the CTT and RTT trays, refer to Figure 5-14.
1. At the Operation Panel, select
2. Ensure the 10-mL tube at CTT (
Wash Solution, the cup at CTT position #16 contains pure water and the cup at CTT
position 15 contains ISE detergent.
3. Ensure the bottle at RTT1 (
Cuvette Wash Solution.
4. Ensure the 10-mL tube at CTT (
5. Ensure the bottle at RTT1 (
NOTE
At your laboratory's discretion, you may use other positions for the washes on each
of the trays, but you must change the entries for the alternate positions in the
appropriate fields on the WASH Set window.
Maintenance
.
WASH3
1
for Cycles.
51
in the CTT cup position 1st time field.
50
in the RTT1 and RTT2 bottle position 1st time field.
.
Execute
) and RTT2 (
2
) and RTT2 (
2
BIOHAZARD
Wear personal protective equipment.
Use universal precautions.
.
Wash
) position #49 contains a 10% solution of Cuvette
1
) position #49 contains a 10% solution of
3
) position #50 contains DI water.
1
) position # 50 contains DI water.
3
123