Maintenance - Siemens ADVIA 2400 Maintenance Procedures

Chemistry system
Hide thumbs Also See for ADVIA 2400:
Table of Contents

Advertisement

5 Maintenance

Maintenance schedule
Perform maintenance procedures at the recommended frequency to maintain the operating
efficiency of your analyzer. Procedures marked with an * may require more frequent performance
(described in each procedure).
WARNING
The maintenance procedures described in this
document are to be performed ONLY by Siemens-
trained users. Some of these procedures require the
top cover be opened and the probe splash shields
removed, exposing the user to biohazard materials
and moving parts.
Daily
Clean the probes.
Clean the mixing rods.
Check reagents and system solutions.
Clean the reaction and dilution cuvette washers.
Inspect the cuvette splash covers
Inspect the probe wash cups
Inspect the pumps.
Wipe condensation from the reagent trays.
Perform startup wash.
Perform shutdown or modified shutdown wash.*
Perform additional ISE wash.*
Record ISE slopes
Weekly
Perform the weekly wash.*
Check the lamp coolant level.
Perform lamp energy check.
Perform cuvette blank (cell blank) measurement.
Clean the exterior analyzer panels.
Monthly
Clean the turntable interiors.
Clean or replace reagent containers (47-50).
Clean the dilution bottle.
Clean the cuvette wash bottle.
Clean the chiller filter.
Maintenance
CAUTION
To avoid reporting faulty data, deterioration
of reproducibility, or damage to the ISE
module and its parts, follow the precautions
listed below:
• Immediately clean up any spills or leaks.
Repair the source of leaks.
• Do not leave the chloride electrode wet
pack open. The electrode dries and
becomes inactive.
• Always condition electrodes before first
use.
Every 2 Months
Clean the dilution tray cuvettes.
Clean and replenish the cuvette conditioner
bottle.
Every 3 Months
Replace the lamp.
Wash the ISE electrode lines.*
Every 4 Months
Clean the ancillary reagent bottle filters.
Clean the pure-water bottle filters.
Replace the reaction and dilution cuvettes.
As required
Back up system files.
Replace probes.
Replenish the RRV-bath oil bottle.
Perform preventive cleaning of the wash
station lines.
Wash all ISE lines (if contaminated).
Condition the ISE electrodes.
Replace ISE electrodes.
Clean the ISE dilution bowl and waste nozzle.
Recover from a power failure.
109

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents