Verifying the Installation

No.
Acceptance Criteria
1
The solar inverter is installed correctly and securely.
2
Cables are routed properly as required by the customer.
3
Cables are evenly tied and no burr exists.
4
The PE cable is connected correctly, securely, and reliably.
5
The DC switch and all the switches connecting to the solar inverter are OFF.
6
The AC output power cable and DC input power cables are connected correctly, securely,
and reliably.
7
Unused terminals and ports are locked by watertight caps.
8
The installation space is proper, and the installation environment is clean and tidy.
Installing an 10-in 1-out SmartACBox
1
Overview
Appearance
Ports
(1) Waterproof connector
for the RS485
communications cable
(COM)
(3) Waterproof connector
for the single-phase
power cable (AC
INPUT)
(5) AC input cable hole 1
(AC INPUT1)
(7) USB port (USB)
(9) Protective earthing (PE)
point
8
(1) Handles
(2) Monitoring
compartment door
(3) Enclosure door lock
(4) Power compartment
door
(5) Mounting plate
(6) Mounting bracket
(2) Waterproof
connector for the
3G/4G antenna
(3G/4G)
(4) AC output cable
hole (AC
OUTPUT)
(6) AC input cable
hole 2 (AC
INPUT2)
(8) Ventilation valve

Advertisement

Table of Contents
loading

This manual is also suitable for:

Smartacbox

Table of Contents