Figure 5-5 Parameter configuration for AISUs connected in daisy-chain mode
Step 3 Press F9 or click Exec.
If Operation succeeded is displayed in the command export area, the AISU is added
successfully. If the AISU fails to be added, identify causes and add the AISU again.
----End
Querying Antenna Sector Status
You can run the DSP SECTOR command to query the antenna sector status.
Procedure
Step 1 In the parameter input area, enter DSP SECTOR in Command (F5), and then click Assist or
press Enter.
Step 2 In the parameter input area, specify related parameters.
The parameter values in the following figure are for reference only.
Issue 02 (2017-06-12)
Control Port Cabinet No., Control Port Subrack No., and Control Port Slot No. are configured
based on the configuration of Huawei base stations. If the AISU is installed in regular mode, the
R0A or RET port on the RRU functions as the control port.
Device Name is user-defined and must be unique in the system.
RAE Subunit Number is set to 1.
Antenna Scenario is configured based on the actual physical conditions. Otherwise, the base station
cannot normally communicate with the AISU.
If AISUs are installed in regular mode, Vendor Code and Serial No. can be left blank, as shown in
Figure 5-4. If AISUs are installed in daisy-chain mode, Vendor Code and Serial No. must be
specified, as shown in Figure 5-5.
Vendor Code and Serial No. are obtained based on the scan result. For details, see
"
section
Scanning the AISUs." Ensure that values of these two parameters are correct.