Pioneer SGY-PM900H90 Installation Manual page 21

Pedaling monitor sensor
Table of Contents

Advertisement

Available languages

Available languages

9
Apply 2 pieces of masking tape in the positions (in the diagram below) within the dotted lines on the
strain gauge unit cover (right side).
The adhesive for the cover hardens in about 3 hours. Do not disturb it for at least 3 hours, and then remove the masking
tape.
This completes the installation of the right sensor's strain gauge unit.
10
Apply masking tape in the positions (in the diagram below) within the dotted lines on the strain gauge
unit cover (left side).
The adhesive for the cover hardens in about 3 hours. Do not disturb it for at least 3 hours, and then remove the masking
tape.
This completes the installation of the sensor on the left crank.
EN
Attaching the Sensors
21

Advertisement

Table of Contents
loading

Table of Contents