Connections; Connection Overview - LG D005KD1N111 Installation Manual

Energy storage system
Hide thumbs Also See for D005KD1N111:
Table of Contents

Advertisement

Installation
22

Connections

Connection Overview

2
PV Array 1
WARNING
Electrical shock hazard. Do not touch uninsulated wires when the PCS cover is removed.
Before starting electrical cable connections or removing the cover, turn off the AC circuit
breaker, PV switch and DC circuit breaker of the battery. (In case of re-installation, turn them off
and wait at least 10-minute standby period of time for complete discharge within this product.)
When the photovoltaic array is exposed to light, it supplies a DC voltage to the PCS.
Battery
PV Array 2
Grid
Energy meter
Internet

Advertisement

Table of Contents
loading

Table of Contents