Wall-Mounting The Chassis - Huawei OptiXRTN 950 V100 Quick Installation Manual

Radio transmission system idu
Table of Contents

Advertisement

c
Installing PGND Cables
M4
Connect PGND cables by using the
removed screws.
1.4±0.14 N· M
3

Wall-Mounting the Chassis

a
Removing Mounting Ears
To the ground point on the
column of the cabinet or the
indoor ground bar
d
Installing the Chassis in the
Cabinet
NOTE
Install the cable tray if provided.
b
Marking and Drilling Holes (1)
Place the chassis on the wall and then mark the positions
of the holes for installing mounting ears. Drill the holes in
the marked positions and install the bolts. After the
installation, ensure a minimum of 50 mm space on the
upper and lower sides of the IDU for ventilation.
13
M6
2.0±0.2 N· M
300 mm
8

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents