UPS5000-S-1600 kVA Quick Guide
Issue: 03
Part Number: 31500DDE
Date: 2020-03-03
1
Overview
Model
Dimensions (H x W x D)
1. Before installation, read the user manual carefully to get familiar with product information and
safety precautions.
2. Use insulated tools during installation and operation.
3. Only engineers certified by Huawei or its agents are allowed to install, commission, and maintain
the UPS. Otherwise, personal injury or equipment damage may occur, and the UPS faults
caused are beyond the warranty scope of Huawei.
Power unit 1
Power unit 2
Copyright © Huawei Technologies Co., Ltd. 2020. All rights reserved.
UPS5000-S-1600KVA-FP
2200 mm x 4200 mm x 1000 mm
Bypass unit
Input and
output unit 1
1
Input and
Power unit 3
output unit 2

Advertisement

Table of Contents
loading

Summary of Contents for Huawei UPS5000-S-1600KVA-FP

  • Page 1 2. Use insulated tools during installation and operation. 3. Only engineers certified by Huawei or its agents are allowed to install, commission, and maintain the UPS. Otherwise, personal injury or equipment damage may occur, and the UPS faults caused are beyond the warranty scope of Huawei.
  • Page 2: Installing The Ups

    (1) Surge protective device (SPD) box (2) Power modules (3) Bypass module (4) Monitoring module (5) SPD and SPD switch (6) Bypass control module (7) Output circuit breaker of power (8) Input circuit breaker of (9) Input circuit breaker of power unit 2 (Q1-2) power unit 1 (Q1-1) unit 2 (Q5-2)
  • Page 3 Combining the Power Units and Bypass Unit 1. Remove the left and right side panels from the input and output unit. 2. Combine the power units, bypass unit and input/output units, and install the connecting plates in the following sequence: bottom, top, and middle. 3.
  • Page 4 5. Install anchor baffle plates. Installing Busbars • Before handling a busbar, wear protective gloves to avoid getting injured by sharp edges. • Move a busbar with caution to avoid scratching cabinets. • Each busbar weighs about 50 kg. Be cautious to avoid injury when moving heavy objects. Preparation: two scaling ladders that are more than one meter high At least two persons are required to carry a busbar.
  • Page 5 2. Install the U-shaped sealing plate component (numbered 01). 3. Install busbar components (numbered 02 and 03). Busbar Component (numbered 03) Busbar component (numbered 02) 4. Use copper bars (numbered 04–06) to connect the busbar components (numbered 02 and 03). Before installation, remove the screws that are partially tightened from the busbar component.
  • Page 6 5. Install the busbar component (numbered 07) and secure it to the cabinet. Busbar component (numbered 07) 6. Install the left sealing plate (numbered 08). 7. Install the side sealing plate (numbered 09) for the input and output unit.
  • Page 7 8. Install the side sealing plate (numbered 10) for power unit 3. 9. Install the rear sealing plate (numbered 11) for the power unit 1 and power unit 2. 10.Install the sealing plates (numbered 12) for the bypass unit and input and output unit.
  • Page 8 11.Install the sealing plates (numbered 13) for power unit 3. 12.Install the busbar (numbered 14) for power unit 3. 13.Install the front and rear sealing plates (numbered 15 and 16) for input and output unit 2.
  • Page 9 14.Install the right sealing plate (numbered 17) for power unit 3. 15.Install supports for the busbar covers. 16.Install the sealing plate of battery wiring protective cover for each power unit.
  • Page 10 17.Install mounting plates (the left and right mounting plates are numbered 18). Power unit 3 Input and Input and output Power unit 1 Power unit 2 Bypass unit plate output unit 1 plate plate plate plate unit 2 plate 18.Install the top busbar covers.
  • Page 11: Installing Cables

    Installing Cables UPS Cable Connection Reference • Prepare cables away from the cabinets to prevent scraps from falling inside. Cable scraps may ignite and cause personal injury or device damage. • After cables have been installed, clean the cabinets in a timely manner. Keep the cabinets and surrounding environment clean and tidy.
  • Page 12 Distances Between Top Copper Bars (unit: mm) Copper Bar Specifications (unit: mm)
  • Page 13 Copper Bar Positions (rear view of the cabinet) (1) Battery Input (2) UPS Output (3) Main Input (4) Bypass Input (5) Battery PE (6) Equipotential ground point Port Description Connection Method Bolt Specifications Bolt Length Torque Mains input Crimped DT terminals 35 mm 47 N·...
  • Page 14 4. Install the U, V, and W copper bars. 5. Connect input and output busbars and battery cables based on the top copper bar position diagram. 6. Install supports and covers on the top of the protective covers for each power unit.
  • Page 15 7. Before power-on, remove the protective covers from the top of the power units. 8. Connect the signal cables between the power unit, input and output unit, and bypass unit. Cabinet Port Bypass Unit Port BP-XS2 (02) Power unit 1 BP-XS6 (connect to the XS6 terminal reserved Power unit 2 in the cabinet)
  • Page 16: Verifying The Installation

    Turn on output circuit breaker Q5-1, Q5-2 and Q5-3. Turn on input circuit breaker Q1-1, Q1-2, Q1-3 and upstream bypass input switch. After the UPS is powered on, initialization begins. The monitoring display unit (MDU) displays the Huawei logo and an initialization progress bar.
  • Page 17 System User LCD Preset Password WebUI Preset Password admin (system administrator) 000001 Changeme operator (common user) 000001 Changeme Initial Startup a) If this is the initial startup, set the language, time, date, network parameters, and system parameters on the Settings Wizard screen. b) After you set parameters on the Settings Wizard screen, the MDU displays the Bypass mode and No battery alarms, which do not need to be handled.
  • Page 18 Download the mobile phone app (Service Expert). On the MDU, choose System Info > Maintenance > Inv. ON and obtain the Bar code and Verification. Open the Service Expert app on the mobile phone. On the home screen of the app, tap StartUp to access the Set Startup screen.
  • Page 19: Shutting Down The Ups

    Power units 1 and 2 share the dry contact ports on control module 1, and power unit 3 uses the dry contact ports on control module 2. You need to set BCB box parameters on the LCD of each power unit. Shutting Down the UPS After the inverter is shut down, if the bypass is normal, the UPS transfers to bypass mode;...
  • Page 20 Scan here for technical support (carrier): Huawei App Store Scan here for more documents: Support-E Support WeChat You can also log in to Huawei technical support website: https://support.huawei.com/enterprise https://support.huawei.com Huawei Technologies Co., Ltd. Huawei Industrial Base, Bantian, Longgang Shenzhen 518129 People's Republic of China...