Toro ProCore Operator's Manual page 15

Hide thumbs Also See for ProCore:
Table of Contents

Advertisement

1. Tie down or rope
2. Tow arm hitch plate
3. Back the tractor/aerator into position in front of the
core processor.
4. Remove the tie down or rope and lower the tow arm
hitch plate into the aerator hitch pivot (Figure 13).
1. Tow arm hitch plate
5. Align the hole in the tow arm hitch plate with the
lower holes in the aerator hitch pivot Figure 14).
Secure the tow arm hitch plate to the aerator hitch
pivot with a hitch pin and lynch pin.
6. Lower the aerator to the ground
7. Secure the pitch control link to the top holes in the
aerator hitch pivot and the frame hitch pivot with
hitch pins and lynch pins (Figure 14).
Figure 12
3. Frame hitch pivot
Figure 13
2. Aerator hitch pivot
• Connect the control link to the front holes in the
frame hitch pivot when operating ProCore 864
and 880 aerators.
• Connect the control link to the rear holes in the
frame hitch pivot when operating a ProCore 660
aerator.
1. Pitch control link
2. Front mounting holes
(ProCore 880 & 864
Aerators)
8. Route the hydraulic hoses to the tractor and connect
to the quick couplers. Make sure the hydraulic hoses
are properly connected to the processor and the
tractor.
9. Route the control harness to the tractor operators
position.
10. Secure the hydraulic hoses and the wire harness to
the tow-arms with cable ties.
Important: When turning the tractor to the
right or left, make sure the hydraulic hoses or
control harness do not become disconnected or
damaged.
11. Operate the core processor and check the hydraulic
fluid level in the tow vehicle. Replenish as required.
12. Remove the storage pins from the front hole
position and insert into the rear hole position during
operation (Figure 15).
15
Figure 14
3. Rear mounting holes
(ProCore Aerator)

Advertisement

Table of Contents
loading

This manual is also suitable for:

09749

Table of Contents