■
SUPPLEMENT ON DRAIN PIPING
Checkpoint after installation
After installation of indoor and outdoor units, panels and electrical wiring, check the following items.
Make sure whether indoor and outdoor units are
1
correctly installed.
2 Make sure whether gas leakage is tested.
Make sure whether insulation is completed.
3
(Refrigerant piping and drain piping)
4 Make sure whether drain water is running smoothly.
Make sure whether the power voltage matches the
5
nameplate.
Make sure whether there is miswiring or incorrect
6
connection.
Make sure whether the ground construction is
7
completed.
Make sure whether the wire gauge is followed by the
8
recommended specifications.
Make sure whether the air intake and air outlet of the
9
indoor and outdoor units are sealed by obstacles.
Panasonic̲PAC-i̲IndoorUnit̲US-le36 36
Panasonic̲PAC-i̲IndoorUnit̲US-le36 36
Checkpoint
Symptom
Check
Fall, vibration, noise
No cooling, no heating
Water leakage
Water leakage
Inoperative, burnout
Inoperative, burnout
Ground leakage
Inoperative, burnout
No cooling, no heating
36
Remark
2011/11/02 15:17:31
2011/11/02 15:17:31