2.10.2 Configuration Procedures - Siemens DMS8000 MP4.30 Connectivity Manual

Simatrix, telscan, sistore burle/philips ltc8000 light-integration device (external viewer)
Hide thumbs Also See for DMS8000 MP4.30:
Table of Contents

Advertisement

Configuring CCTV network

2.10.2 Configuration procedures

Building Technologies
Fire Safety & Security Products
The following are the configuration procedures for the Light-integration Device:
Adding the folder for the Light-integration Devices
1. Open the Composer project.
2. Select or add the destination folder in the tree.
3. Select the Video menu icon
4. In the menu that appears, select Light Integrated Devices
A new folder node appears in the Composer tree.
Note: To allocate appropriate positions for multiple devices, you can insert mul-
tiple folder nodes in various locations of the system structure tree.
Adding the device
1. Select the Light Integrated Devices folder.
2. If required, add more subfolders
3. Add a new device, selecting either the unit with HTML-based viewer (Fig 33) or
the one with installed application viewer (Fig 34).
A new node appears in the Composer tree.
Note that the icon
on the icons and use the tooltip text to identify the one you need.
4. Select the new node, press F2 (or click on it again), and then rename the device
description appropriately.
Fig 33
Selecting the icon for adding a device with a web-based viewer
Fig 34
Selecting the icon for adding a device with an application viewer
048_DMS_DMS8000_Connectivity_Video_MP4.30_A6V10062457_a_en.doc
is the same for both types; move the cursor of the mouse
39
06.2010

Advertisement

Table of Contents
loading

Table of Contents