Huawei LUNA2000 Series User Manual page 42

Hide thumbs Also See for LUNA2000 Series:
Table of Contents

Advertisement

LUNA2000-(5-30)-S0
User Manual
Figure 4-2 Floor-mounted installation dimensions
Procedure
Step 1 Align the floor support with the wall surface and keep the support 10 mm to 15 mm away
from the wall surface. Level the hole positions using a level, and mark the hole positions for
installing the floor support using a marker. Align the marking-off template with the surface of
the floor mounting kit, determine the drilling hole positions on the wall for securing the power
control module, and mark the positions using a marker.
Step 2 Install the floor support.
When drilling holes, avoid the water pipes and power cables buried in the wall.
Issue 01 (2020-09-18)
M6x60 expansion bolts delivered with the battery are used to install the floor support and power control
module. If the length and quantity of the bolts do not meet installation requirements, prepare M6
stainless steel expansion bolts by yourself.
Copyright © Huawei Technologies Co., Ltd.
4 System Installation
36

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents