Cable Layout
No.
Cable Layout Rules
1
The armoring layer of armored cables should be grounded.
The ground cable is securely connected to the equipment room ground bar. Use a
2
multimeter to measure the resistance between the PDC ground cable and the equipment
room ground bar. The resistance must be less than 1 ohm.
3
Cables must be securely connected in the correct phase sequence.
4
Cables must be neatly arranged and cable insulation layers must be intact.
5
Different types of cables must be routed separately.
Connection ports and cabling methods must facilitate maintenance, cable routing, and
6
capacity expansion.
Cable connectors prepared onsite must be secure, reliable, and neat, and conform to
7
specifications.
Power cables, ground cables, and signal cables must be securely connected. Adapters must
8
be securely plugged or screwed.
The N and PE cables are bound separately from the L1/L2/L3 or L cables for each circuit
9
breaker. Cables are converged at the beam and bound in groups by cable ties.
Preparing Terminals
5.2
The following figures show how to prepare DT, OT, and cord-end terminals.
Making DT terminal
Making OT terminal
13
(1) Cable
(2) Heat shrink tubing
(3) DT terminal
(4) Electric hydraulic pliers
(5) Heat gun
(1) Cable
(2) Heat shrink tubing
(3) OT terminal
(4) Electric hydraulic pliers
(5) Heat gun