Installation Checklist - Huawei NIP6830 Quick Start Manual

Network intelligent protection system
Table of Contents

Advertisement

After the installation, verify the installation against the following checklist. The result of each item must be pass.
No.
Check Item
1
The device and boards are in good conditions.
2
The cabinet is installed as required and adequately grounded.
3
The device is mounted into the cabinet as required and adequately grounded.
4
Boards and daughter cards are installed in correct slots.
5
Cable racks, mounting ears, and fiber spools are installed as required.
6
The AC or DC power cable is correctly connected to the device.
7
Fiber and network cables are correctly connected to the device.
8
After the device is powered on, indicators of all modules are normal.
9
Filler panels are installed in empty slots.
10
Cables are properly tied and routed along the cabling racks.
11
After the device is mounted into the cabinet, the cabinet door is installed.

Installation Checklist

14
Result
Pass
Fail
Pass
Fail
Pass
Fail
Pass
Fail
Pass
Fail
Pass
Fail
Pass
Fail
Pass
Fail
Pass
Fail
Pass
Fail
Pass
Fail