Recommended Maintenance Program; General Construction - ABB AMA Manual

High voltage process performance motors
Table of Contents

Advertisement

7.3.1 Recommended maintenance program

Maintenance
object

7.3.1.1 General construction

Maintenance object
Machine operation
Mounting and foundation
Exterior
Fastenings
Anchor bolts
Maintenance object
High voltage cabling
High voltage connections
3BFP 000 063 R0101 REV D
The Level 4 maintenance should be performed after every 80 000 equivalent operating hour.
When a L4 maintenance is conducted it replaces the L1, L2 or L3 maintenance otherwise
scheduled, and it leaves their rotation unaffected, see Table 7-1 Maintenance intervals.
Abbreviation used in maintenance program:
V = Visual checking
C = Cleaning
D = Disassembling and assembling
R = Reconditioning or replacement
T = Testing and measurement.
Not all options are applicable for all machines.
Table 7-1. Maintenance intervals
MAINTENANCE INTERVAL
In equivalent operating hours or time period, which ever comes first
L1
L2
4 000 Eq. h
8 000 Eq. h
12 000 Eq. h
16 000 Eq. h
20 000 Eq. h
28 000 Eq. h
½ year
Annual
L1
L2
L3
V / T
V / T
V / T
V
V / T
V / T
V
V
V
V
V / T
V / T
V
V
V / T
Main supply connection
L1
L2
L3
V
V / T
V / T
V
V / T
V / T
Manual for High Voltage Process Performance Motors
L3
L4
24 000 Eq.h
80 000 Eq.h
3-5 years
Overhaul
L4
Check / Test
V / T
Starting, shut down, vibration measurement, no-load point
V / T / D
Cracks, rust, alignment
V
Rust, leakage, condition
V / T
Tightness of all fastenings
V / T
Fastening, condition
L4
Check / Test
V / T / D
Wear, fastening
V / T / D
Oxidation, fastening
Check / Test
Maintenance - 49