6. Download & S/W upgrade
6. Download & S/W upgrade
6.1 S/W download setup
UART download Preparation
• Target terminal
• PIF-Union
• RS-232 Cable and PIF-UNION to Phone interface Cable
• Power Supply or Battery
• PC supporting RS-232 with Windows 2000 or newer.
• Cradle
USB download Preparation
• Cradle
• Data cable
If you are going to use battery, the voltage of the battery should be over 3.7V for stable power supplying
during S/W download.
LGE Internal Use Only
[Figure6.1] S/W download (UART) & upgrade setup
[Figure6.1.1] S/W download (USB) & upgrade setup
- 106 -
GD910 service manual
Copyright © 2009 LG Electronics. Inc. All right reserved.
Only for training and service purposes