Requirements For The Site - Beko BEKOKAT CC-1200 Installation And Operation Manual

Catalytic converter for removing oil from compressed air, version 11 bar
Table of Contents

Advertisement

2.3

Requirements for the site

The installation location must fulfil the following requirements:
 The installation will be executed within a building.
 The BEKOKAT
®
 The ambient temperature must not exceed the specifications on the rating plate.
 Select a level, solid and vibration-free installation surface with a maximum inclination of
< 5% to all sides. The weight of the BEKOKAT
selecting the surface.
 Set up the converter so that the system is easily accessible from the sides and from the
top.
 Ensure adequate ventilation and heat dissipation.
 Maintain a safe distance to traffic routes when setting up the BEKOKAT
 The blow-off direction of the safety valve must be away from traffic routes. An
appropriate risk assessment must be carried out at the installation site.
 Equip the system with suitable collision protection.
 Ensure that no water or condensate can ingress into the BEKOKAT
 Install an easily accessible manual shut-off valve before and after the assembly unit.
 The surrounding area must be free of aggressive, corrosive, caustic, toxic, flammable
or oxidising substances.
 The intake area of the compressor must be free of aggressive, corrosive, caustic, toxic,
flammable or oxidising substances.
V01 / 11-043
must be protected from exposure to moisture.
Installation and Operation Manual BEKOKAT
®
must be taken into account when
®
®
.
®
.
25 / 88

Advertisement

Table of Contents
loading

Table of Contents