NEC Express5800/R310g-E4 User Manual page 65

Hide thumbs Also See for Express5800/R310g-E4:
Table of Contents

Advertisement

Chapter 3 Setup
4. Open the acrylic cover, and press the POWER switch.
The System POWER LED goes on green, the server starts.
When the server starts, the server runs a power-on self test (POST) to check hardware. For details, see
Chapter 3 (1.1 POST).
After a while, the logo will appear on the screen.
Acrylic cover
Do not connect or disconnect USB device while POST is running.
Important
Do not power off the server while POST is running.
Express5800/R310g-E4, R320g-E4, R320g-M4 User's Guide
System POWER LED
POWER switch
1. Turning on the Server
65

Advertisement

Table of Contents
loading

Table of Contents