Sharp SRS Mounting System Installation Manual page 29

Solar power system, rectangular modules
Table of Contents

Advertisement

6
IN S TAL L AT IO N WO Rk
8. Place 2 butyl pads under the holes drilled in the tile.
The butyl should be located on the underside of the
tile. Reinstall the tile on to the roof according to the
locations marked previously.
Bottom butyl pad
(AE105)
Remove brown
backing paper to
expose sticky side.
Adhere the sticky side
of the butyl pad to
bottom side of tile.
9. Inject Sharp supplied silicone caulk (AE107) into the
holes to form a dome. The dimensions of the dome
are ~ 0.75" in height and 1.5" in diameter.
Tile
Bottom butyl pad
CORRECT
Bottom side of the tile
Be sure to align
the center of the holes
in tile and butyl pad.
Fill the hole with caulk.
Silicone caulk
WRONG
10. Insert 2 top butyl pads onto the tile standoff legs.
Insert
Remove
paper backing
11. Insert the tile roof stand off into the drilled holes until
it rests on top of the aluminum support plate.
 9
Tile roof stand off
AE104
Top butyl pad
AE106

Advertisement

Table of Contents
loading

Table of Contents