3 Installing RRU and SRXU Hardware
2.

3.2 Procedure for Installing the RRU and SRXU

The procedure for installing the RRU and SRXU varies with the installation scenarios. The
procedure involves making preparations, installing the RRU and SRXU, connecting related
cables, checking the hardware installation, and installing the housing of the RRU and SRXU.
Context
After the NodeB is installed, it must be powered on within 48 hours.
Procedure
Step 1 Unpack the RRU and SRXU, check the items in the package, and prepare tools and instruments.
Step 2 Install the RRU. The installation mode of the RRU varies with the installation scenarios.
3-26
(1) Cable tie
Bind the label to the cable, as shown in
tie.

Figure 3-29 Binding the label to the cable

(1) Cable tie
NOTE
Ensure that the labels are arranged in an orderly and neat manner and the cable ties are installed in
the same direction. An extra length ranging from 3 mm to 5 mm should be left for each cable tie.
CAUTION
NOTE
Contact Huawei engineers for confirmation if:
You choose to prepare the devices, cables, and connectors by yourself.
l
You need to shorten the cable of a specified length.
l
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd
(2) Label
Figure
3-29. Cut off the surplus part of each cable
(2) Cable
RRU
User Guide
(3) Cable
(3) Label
Issue 01 (2008-04-18)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rru3804Rru3801e

Table of Contents