Maintenance Schedule; Maintenance Work; Wear Parts Exchange - Beko BEKOMAT 12 Original Installation And Operation Manual

Table of Contents

Advertisement

Original installation and operation manual

10.2 Maintenance schedule

Maintenance

Wear parts exchange

Cleaning work
Visual inspection
Leakage test

10.3 Maintenance work

For maintenance work to be carried out, the following prerequisites must be fulfilled and the preparatory tasks must
have been completed.
Tools
Screwdrivers:
Cross-head size 2.5 mm (0.09")
Flat-blade size 2.5 mm (0.09")
e.g. adjustable spanner
Cleaning brush made of wire or soft
plastic material with
Ø max. = 1.5 mm (0.05")
Ø max. = 2.5 mm (0.09")
1.
Decommissioning and disassembly must have been completed.
10.3.1 Wear parts exchange
Illustration
Interval
Annually
Annually
Weekly
At the end of all assembly work and maintenance and
servicing work on the product
Prerequisites
Material
Sealants
Lubricant for greasing the O-rings
Mild detergent
Cotton cloth or disposable tissue
Preparatory tasks
Description / explanation
3
2. Loosen the 4 pan-head screws [3].
BEKOMAT
12, 12 CO, 12 CO PN63
®
Protective equipment
Always to be worn:
37 | 64

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bekomat 12 coBm12Bm12coBm12copn63Bekomat 12 co pn63

Table of Contents