ABB Totalflow NGC8206 Startup Manual page 20

Hide thumbs Also See for Totalflow NGC8206:
Table of Contents

Advertisement

Peak Find Screen for Chrom 2 (Lights)
Troubleshooting Clues
Clue:
Unnormalized total is not
Possibility:
Clue:
Gate Markers are located on the side of a peak.
Possibility:
Clue:
Chrom 2, C2 peak time is not eluting around 220 seconds.
Possibility:
Clue:
NC5 peak time is not eluting at approximately 160 seconds.
Possibility:
Clue:
A small peak elutes after NC5 Peak.
Possibility:
18
Carrier pressure set points are out of range. See
Using Peak Find.
Peaks are integrated correctly but not labeled. See
Labeling Peaks.
Peaks are incorrectly labeled. See Labeling Peaks.
Front Height Ratio may need refined. See Integrating
Peaks.
Gates may need to be added. See Gating Peaks.
Column 2 Carrier Pressure may not be correct. See
Carrier Pressure Set Point.
Column 1 Carrier Pressure may not be correct. See
Carrier Pressure Set Point.
Inject time may be too long. See Forward Flow
Duration.
0.5% of 100%.
±

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents