ABB Totalflow NGC8206 Startup Manual page 5

Hide thumbs Also See for Totalflow NGC8206:
Table of Contents

Advertisement

3B
Mount the sample
conditioning module on the
sample conditioning bracket.
Step 4
Install the Sample Probe(s)
Totalflow strongly suggests a temperature compensating pressure
regulating sample probe be used. Refer to any manufacturer's
recommendations supplied with the probe. If the sample probe is to be
mounted in a section of pipe where cathodic currents exist, the user
should install isolators in the sample tubing between the probe and the
NGC.
NOTE: API 14.1 recommends using a Strouhal number to determine
probe lengths. This reduces the effects of resonant vibration.
Please refer to API standards for additional information.
Step 5
Connect Sample Streams
IMPORTANT: Remove sealing screws from the input ports to connect
the tubing. Unused ports MUST remain sealed to keep
moisture from entering the manifold and potentially
damaging the instrument.
5A
Connect the tubing
between the sample
probe and conditioning
module. See Precautions
below.
5B
Connect the tubing between
the conditioning module and
feed-through assembly.
Purge sample gas through
tubing during connection.
U-BOLT
SAMPLE CONDITIONING
SYSTEM MOUNTING BRACKET
3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents