Beko BEKOMAT 12i Original Installation And Operation Manual page 44

Table of Contents

Advertisement

BEKOMAT
®
12i / 12i CO / 12i CO PN63
Illustration
1
44 | 76
Connection work - series connection
Connection cable [X7]
Connection cable [X6]
B
4
X6
X7
6
36
C
4
5
2
Original installation and operation manual
Description / explanation
7. Fit the cable gland components [4, 5, 6] over the
connection cable [X6] and the connection cable [X7].
8. Insert the connection cable [X7] into the
left cable gland [C].
9. Insert the connection cable [X6] into the
right cable gland [B].
10. Connect connection cable [X6] and connection
cable [X7] according to the terminal diagram "4.9
Terminal diagram power control board" on Page 32.
5
11. Draw cable [X6] and connection cable [X7] taut.
6
12. Screw the cable gland components [4, 5, 6] onto the
right cable gland [B] and the left cable gland [C].
13. Fit the screw terminal [36].
14. Set the top cover [1] in place and insert the screws [2].
15. Tighten the screws [2] with a torque of
0.5 Nm +0.5 Nm (0.37 ft-lb +0.37 ft-lb).

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bekomat 12i coBekomat 12i co pn63

Table of Contents