Download Print this page

Huawei FusionPower6000 Quick Manual page 6

Hide thumbs Also See for FusionPower6000:

Advertisement

Path
Parameter
Setting
Device attribute
Select Transformer from the drop-down list box.
Choose System
Select Transformer_LD-B10 or Transformer-ABB-
Settings >
Device Type
SCB11-2000 from the drop-down list box based on the
Device
actual type of the transformer.
Management
Connect To
Select ECC800 from the drop-down list box.
and click Add
Device. The
Communications
Select COM1 from the drop-down list box.
Port
parameters for
adding devices
In this example, Device Address is set to 1. During
Device Address
actual configuration, set the device address for the
are displayed.
transformer based on the actual situation.
3. Click Test Connect to check whether the transformer is properly connected to the ECC800-Pro.
Adding an SVG
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Add an SVG.
Path
Item
Description
Device attribute
Select PDU from the drop-down list box.
Choose System
Select SVG-APF-NOVTIUM, SVG-In-Power, or
Device Type
Settings > Device
Compensating Cabinet from the drop-down menu.
Management and
Connect To
Select ECC800 from the drop-down list box.
click Add Device.
Communications
Select COM2 from the drop-down list box.
The parameters
Port
for adding devices
In this example, Device Address is set to 1. During actual
are displayed.
Device Address
configuration, set the device address for the SVG based
on the actual situation.
3. Click Test Connect to check whether the SVG connects to the ECC800-Pro properly.
2.6
Creating a PowerPOD Plan View
1. Choose Home > Plan View and click Create a view in Power Module View. The Modify Basic
Config dialog box is displayed. Set the layout and device quantity in Location, Layout, and Half-
size cabinet qty./row based on the actual PowerPOD scenario.
2. Drag the icons of registered devices and devices on the cabinet list to the corresponding
positions in the layout diagram. Double-click the device icon. On the Basic Configuration page
that is displayed, modify the value of Device Name. Click Exit Edit Mode to create a PowerPOD
plan view.
FusionPower6000 V100R021C10 Quick Guide
Creating a PowerPOD Plan View
2.7
1. Go to the power module view, click Modify Device, select the corresponding power
distribution device, and set Device No based on the setting rules.
When multiple power distribution devices of the same type are connected to the ECC, the
management system can distinguish the devices by device No.
Identifiers of the transformer, SVG, APF, UPS, feeder cabinet, and lithium battery cabinet: device
type ID + device No.
Identifier of the low-voltage cabinet: device type ID + detailed model ID + device No.
The default value of device No. is automatically generated based on the sequence in which devices
are added. You need to change the value based on the sequence of power distribution devices. The
setting rules are as follows:
Transformer, SVG, APF, UPS, feeder cabinet, and lithium battery cabinet: If the device types are
the same, the start device No. is 1. The device No. increases in ascending order based on the
sequence of power distribution devices.
Low-voltage cabinet: If the device types and detailed models are the same, the start device No.
is 1. The device No. increases in ascending order based on the sequence of power distribution
devices.
2.8
Commissioning NetEco Management
Data Center Management
1. Connect the communication cable.
2. Set NetEco parameters.
3. Obtain the NetEco software license.
4. Power on the server.
5. Log in to the NetEco client.
6. Load the license.
7. Install the NE mediation.
8. Create a management domain.
9. Adding a PowerPOD.
10.Create an ECC800-Pro on the NetEco.
CloudOpera NetEco Management
1. Logging In to the EDCM (Using a Web Client).
2. Installing the EDCM App.
3. Allowing a User to Log in to the EDCM on a Mobile Device.
4. (Optional) Replacing the App Certificate on a Mobile Device.
5. Logging In to the EDCM App.
6. Setting EDCM Communication Parameters on the ECC800-Pro.
7. Connecting to the Network.
For details, see the
FusionPower6000 V100R021C10 User Manual
.
03
Copyright © Huawei Technologies Co., Ltd. 2022. All rights reserved
.

Advertisement

loading

This manual is also suitable for:

V100r021c10