Installation Procedure; Frame R3 - ABB ACS880-01 Installation Manual

Flange mounting kit
Hide thumbs Also See for ACS880-01:
Table of Contents

Advertisement

Installation procedure

Frame R3

1. Frame R3: To remove the fan assembly, push the retaining clip with a flat
screwdriver. Lift the assembly up. See also steps for IP21 on page 115.
2. Frame R3: Insert the sealing plug to the hole shown in the figure.
Mechanical installation for ACH580-31 and ACQ580-31 111

Advertisement

Table of Contents
loading

Table of Contents