LG BUEL011HBC1 Installation Manual page 34

Residential battery unit
Table of Contents

Advertisement

Available languages

Available languages

Installation
Press the POWER button to turn the battery unit on. And then press and hold the START
m
(5s) button for 5 seconds. You can hear the sound "click".
If SOC level is shown on the LED display, the battery operation has been normally
succeeded.
Find the main label on the right side of the battery unit and mark the checkboxes of the
n
applicable items using oil-based autograph pen (black).
34
a
b

Advertisement

Table of Contents
loading

This manual is also suitable for:

Buel015hbc1

Table of Contents