SUN2000-(196KTL-H3, 200KTL-H3, 215KTL-H3)
Seires
User Manual
Maintenance list
Item
● Cleanness of
● Fans
System running
status
Electrical
connections
Grounding
reliability
Issue 03 (2021-09-30)
Check Method
● Check whether there is dust on
air intake and
the air intake and exhaust vents.
exhaust vents
If necessary, remove the baffle
of the air intake vent.
● Check whether the fans produce
abnormal sounds during
operation.
● The inverter is not damaged or
deformed.
● The inverter operates with no
abnormal sound.
● When the inverter is running,
check whether all inverter
parameters are correctly set.
● Cables are securely connected.
● Cables are intact, and in
particular, the parts touching
the metallic surface are not
scratched.
● Check whether the sealing caps
of idle DC input terminals fall
off.
● Check that the idle COM and
USB ports are locked by
waterproof caps.
Ground cables are securely
connected.
Copyright © Huawei Technologies Co., Ltd.
8 Maintenance
Maintenance
Interval
Once every 6 to 12
months
Once every 6 months
The first inspection is
6 months after the
initial commissioning.
From then on, the
interval can be 6 or
12 months.
The first inspection is
6 months after the
initial commissioning.
From then on, the
interval can be 6 or
12 months.
81