50/60
Maintenance and repair
7.
Remove the clamps.
8.
Remove the split rollers
vertically upwards.
After mounting the
PE, the split rollers
are correspondingly
assembled in the reverse
order.
Bosch Rexroth AG, MIT: HQ 5/H, HQ 5/XH, 3 842 558 544/2017-07
Fig. 28:
Removing the split rollers (3/3)
7
8
557 617-28