LG multi V ARUN Series Installation Manual page 113

Hide thumbs Also See for multi V ARUN Series:
Table of Contents

Advertisement

2 New Dry contact
2.1 Demand Control
ODU Dry contact has provided Two different methods for Demand control
- Using Contact signal
: High/ Low pressure value s are changed by setting value of Rotary S/W
- Using Analog signal with DDC Module
: High/ Low pressure value s are changed by setting value of DDC Module.(DC 0~10V)
[Rotary S/W setting ]
SW_STEP
0, 1, 2, 3, 4, 5, 6
D, E
[Setting ]
SW_STEP
- Each connecting methods
1. Using Contact signal
<Without External power source>
SW_VOLT2
SW_VOLT1
Notes
Do not input the voltage signal in
"NON VOLT" setting mode otherwise
it will cause serious damage
Input Signal
Contact signal
Analog signal
Using Contact signal
Using Analog signal with DDC Module
SW_VOLT2
LG does not
supply this section
(Field supply)
<With External power source>
SW_VOLT1
Connect separate
External voltage of
DC12V
Installation Manual 113
New Function
LG does not
supply this section
(Field supply)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents