ABB C1900RC Operating Manual page 30

Circular chart recorder/controller
Hide thumbs Also See for C1900RC:
Table of Contents

Advertisement

...5 CONTROL OPERATION
...5.9 Introduction to Standard Control
Decrease Proportional Band
Response Time
Time
28
Initial Settings
Proportional Band = 100%
Integral Action Time = OFF
Derivative Action Time = OFF
Adjust the set point a small amount
Hold the set point at the new value until
the process begins to move
Reset the set point to the original value
Observe response of process
Response Time
Note Proportional Band value (PBc)
Measure the critical cycle time (tc)
Calculate Terms
P
P
P+I
2 x PBc
2.2 x PBc
I
tc/1.2
D
Fig. 5.17 Manual Tuning
Critical
Cycle time (tcc)
P+D
P+I+D
1.6 x PBc
1.6 x PBc
tc/2
tc/2
tc/12
tc/8
Increase Proportional Band
Response Time
Time

Advertisement

Table of Contents
loading

This manual is also suitable for:

C1900

Table of Contents