Post-Installation Check - Huawei FDT2108D-288 Quick Installation Manual

Table of Contents

Advertisement

FDT2108D-288&576
Quick Installation Guide
Category
Cabinet
installation
Cable
routing
Optical fiber
Issue 02 (2021-06-15)
8
No.
Item
1
Check whether the cabinet doors can be opened and closed
easily.
2
Check whether the screws between the base and the ground,
between the base and the cabinet are properly installed.
Specifically, check whether all cabinet screws are installed and
tightened, and whether spring washers, flat washers, and
spacers are installed in the correct sequence.
1
Check whether the cables are arranged in order without
crossing or excessive bending.
2
Check whether the bending radius of cables is greater than or
equal to 60 mm, and ensure that cables are not bundled at the
bends.
3
Check whether cables are bundled moderately in even spacing
and the surplus parts of the cable ties are cut off smoothly,
whether the claps on the ties face the same direction to achieve
a neat overall appearance, and whether cables.
4
Check whether ground cables are correctly and reliably
connected.
5
Check whether different types of cables, such as signal cables,
and ground cables are routed separately with a spacing greater
than 30 mm.
6
Check whether lugs for ground cables are soldered or crimped
securely and whether lug stems of the ground cables, and bare
cables are covered with protection tubes or insulation tapes.
Ensure that there is no bare copper wire in lugs or terminals,
and spring washers and flat washers are installed correctly.
7
Check whether cable labels are correctly filled in and securely
attached, and whether labels are arranged in order and in the
same direction to facilitate viewing.
1
Check whether the fiber connecting points are clean.
Copyright © Huawei Technologies Co., Ltd.

Post-installation Check

8 Post-installation Check
20

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fdt2108d-576

Table of Contents