5. Install signal cables for SUN2000-4.95KTL-NHL2.
Checking the Installation of SUN2000-4.95KTL-NHL2 and
1.4
Powering On the SUN2000

Post-Installation Check

No.
Acceptance Criteria
1
The SUN2000 is installed correctly and securely.
2
The WLAN antenna is installed correctly and securely.
3
Cables are routed properly as required by the customer.
4
Cable ties are evenly distributed and no burr exists.
5
The PE cable is connected correctly and securely
6
The DC switch and all the switches connected to the inverter are set to OFF.
7
The AC output power cable, DC input power cables, and signal cables are connected
correctly and securely.
8
Unused terminals and ports are covered by watertight caps.
9
The installation space is proper, and the installation environment is clean and tidy.
Pull the DC input power cables back to
ensure that they are connected securely.
COM port (COM)
Extension cables for DC terminals
7
Click

Advertisement

loading

This manual is also suitable for:

Sun2000l-4.125ktlSun2000l-4.95ktl