1
Overview
• This document describes how to use the output terminal, address board, and input
terminal that are applicable to 15 kW and 20 kW chargers.
• The address board needs to be soldered to the output terminal and connected to the
output terminal of the charger.
• The input terminal is connected to the input terminal of the charger, as shown in the
following figure.
(1) Charger
(2) Output terminal
(3) Address board
(4) Input terminal
2
Output Terminal and Address Board
2.1
Output Terminal
Output Terminal Appearance
Model: CZ36E-20Z (not used with an address board)
Model: CZ36E-20Z-02 (used with an address board)
NOTICE
• DC output +, DC output –, hardware address line,
charger in-position detection, and control ground signals
are hazardous voltages so basic insulation is designed
between these signals and the enclosure.
• The CAN signal line is a safety extra-low voltage (SELV).
Functional insulation is designed between this signal
and the enclosure; enhanced insulation is designed
between this signal and hazardous voltages.
Copyright © Huawei Technologies Co., Ltd. 2018. All rights reserved.
• The terminals and address board described in
this document apply to 15 kW and 20 kW
chargers.
• The terminals and address board described in
this document need to be supplied by the user,
not Huawei.
Output Terminal Port Definitions
Port
Name
P1
NC
P2, P3
DC+
P4, P5
DC-
A1
ADDRESS_0
B1
ADDRESS_1
NC
C1
ADDRESS_IO
A2
NC
B2
LINK_CHECK
C2
SEC_GND
A3, B3, C3,
A4, B4, C4,
NC
A5
B5
CANBL
C5
CANBH
1
Function
Remarks
None
-
DC output +
DC output of
DC output –
the charger
Hardware address line
Connects to
(row address)
the address
Hardware address line
board.
(column address)
15 kW charger: none
-
20 kW charger: address
extension (extended
-
address)
None
-
Charger in-position
B2 and C2
detection
need to be
short-circuited.
Control ground
None
-
Cascades to
CAN signal line
the monitoring
module of the
CAN signal line
system.

Advertisement

loading

Summary of Contents for Huawei CZ36E-20Z

  • Page 1 Issue: 02 Part Number: 31509297 Date: 2018-06-15 Copyright © Huawei Technologies Co., Ltd. 2018. All rights reserved. Overview • This document describes how to use the output terminal, address board, and input terminal that are applicable to 15 kW and 20 kW chargers.
  • Page 2 Address Board Address Board Function The charger provides the hardware address function. It interacts with an address board and different pull-down resistors to set different addresses. The address board supports up to 36 addresses. The resistor selection method is the same for ADDRESS_0 (row No.) and ADDRESS_1 (column No.). Install pull-down resistors R0 and R1 according to the following figure and table.
  • Page 3 Electrical Connection Preparing Cables Determine the heat resistance grade of the cable insulation material based on the ambient temperature. It is recommended that the cables resist heat of at least 105°C. Cables for the 15 kW Charger Recommended Cable Specifications (Choose Any of the Port Remarks Following)
  • Page 4 Support After logging in to the technical support app or website, you can search for the device model to view or obtain more information. You can also log in to Huawei technical support website: http://support.huawei.com Huawei Technologies Co., Ltd. Huawei Industrial Base, Bantian, Longgang Shenzhen 518129 People's Republic of China www.huawei.com...

This manual is also suitable for:

Cz36e-20z-02