Table 5.12 Floor Load Rating For 9960 Controller With 4 Disk Arrays - Hitachi 9900 User And Reference Manual

A subsystem
Hide thumbs Also See for 9900:
Table of Contents

Advertisement

Table 5.12
Floor Load Rating for 9960 Controller with 4 Disk Arrays
Floor Load Rating
kg/m
2
(lb/ft
2
)
500 (102.4)
450 (92.2)
400 (81.9)
350 (71.7)
300 (61.4)
a *1
G
G
600
600
16
(23.6)
(23.6)
(.6)
G
G
9960 Disk
9960 Disk
Array
Array
Figure 5.23 9960 Disk Subsystem with Maximum Configuration
Required Clearance (a+b)
Clearance (C) in meters (feet)
C = 0
C = 0.2 (0.66)
0.2 m (0.66 ft)
0
0.8 m (2.6 ft)
0.3 m (1 ft)
1.5 m (4.9 ft)
1.0 m (3.3 ft)
2.5 m (8.2 ft)
1.9 m (6.2 ft)
4.1 m (13.5 ft)
3.3 m (10.8 ft)
4350(171.3)
G
G
600
718
(23.6)
(28.3)
G
G
Front
9960
9960 Disk
Controller
Array
Hitachi Lightning 9900™ User and Reference Guide
C = 0.4 (1.31)
C = 0.6 (1.97)
0
0
0
0
0.5 m (1.6 ft)
0.2 m (0.66 ft)
1.4 m (4.6 ft)
1.0 m (3.3 ft)
2.7 m (8.9 ft)
2.1 m (6.9 ft)
G
G
600
600
(23.6)
(23.6)
G
G
9960 Disk
9960 Disk
Array
Array
Floor cutout area for cables
Screw jack
Caster
Service clearance
G
Grid panel(Perforated tile) should be at
least 450mm(17.7") x 450mm(17.7")
C = 1.0 (3.28)
0
0
0
0.3 m (1 ft)
1.3 m (4.3 ft)
(Unit: mm(inches))
b *1
G
800
(31.5)
800
2400
(31.5)
(94.5)
600
16
(23.6)
(.6)
G
800
(31.5)
C *1
9960 Disk
Array
107

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Freedom storage lightning 9900

Table of Contents